Wednesday 20 June 2018

BHP Ballast Ploughs.

BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP01 and BP02.

We finally caught them top and tail on a ballast consist at Walla Siding.

Here's a pic of BP01.


No comments:

Post a Comment