Saturday, 10 May 2025
FMG 123 loaded crosses FMG 727 empty 5km.
Saturday, 3 May 2025
BHP's 4464 'Celebrating 50 Years 1969 To 2019'.
I do not see this BHP SD70ACe 4464 'Celebrating 50 Years 1969 To 2019' locomotive leading very often, and less so when I'm in a position to capture an image of it. Well, it finally happened on Thursday, May 1, 2025.
Wednesday, 26 June 2024
Finucane Island, June 18, 2024.
Wednesday, 5 June 2024
A quick arvo on the 4th of June at FMG.
A bit over an hour was spent at my usual hack spot for FMG, between the 5 km curve and the entrance to their port yard, on the afternoon of June 4, 2024 and four trains were observed with a fifth, an empty departing as I was arriving, which happens to me a lot!
This was the first time out for some months due to a number of issues, the car went to Perth to have the roof replaced and some other rust repairs, this was deemed cheaper than a replacement vehicle. I also managed to damage my primary everyday lens, the Canon 28-300 L, and broke the GPS unit on my camera setup. The Canon 5DIII body seems to have survived coming off the car at 60 km/h on Ballast Road at Hampton, Kalgoorlie, but I have noticed some strange exposures when using my other lenes, so a new camera may have to be planned for, testing is continuing. I have only just ordered a new replacement 28-300 mm L series Canon lens, and it seems these may have also now been discontinued by Canon...
However, I digress, back to the rail action, so, four trains were seen in a couple of hours out, two empty departures from the port and two loaded arrivals, one with a quad loco combination which is usually the bank engines being returned for servicing.
Port yard pilot locomotive was aging GE 9-44CW unit 004 shunting the compressor cars from the empty tracks to the rear of the loaded rakes.
The first empty train was SD70ACe-P6 units 729 leading SD70ACe/LCi unit 717 in the standard locomotive pairing that is in use on FMG with 119 waggon pairs for 238 waggons which departed the port at 1529 hrs.
Then at 1538 hrs a loaded train rolled under the Great Northern Highway overpass and into the Port behind the pairing of SD70ACe/LCi unit 713 leading the class leader of the AC44C6M rebuild model locomotives 101. This train also had 119 waggon pairs for 238 empty waggons.
A second loaded followed the first some twenty minutes later at 1608 hrs but this time it had quad locomotive power on the front. This is usually due to mine bank engines being returned to town for servicing requirements and happens on a regular basis.
AC44C6M locomotive 111 led SD70ACe/LCi unit 704 with AC44C6M pair 114 and 103 rounding out the quaddie with yet again 119 waggon pairs for 238 empty waggons. It is nice to see FMG sticking to consistent train lengths as in the past I have counted quite a variance in the number of waggon pairs per service.
The final train for the afternoon was an empty departing at 1634 hrs behind AC44C6M unit 117 leading SD70ACe/LCi locomotive 706 and the now standard 119 waggon pairs for 238 empty waggons.
Enjoy!
Monday, 8 January 2024
Ten SD70ACe's and only one 9-44CW seen in a few hours. Pt 2.
Further to the earlier post, on the 27th of December 2023 an arvo out near FMG saw three empty trains all with a pair of SD70ACe variants and two loaded trains with another pair of SD70ACe units and one with an aging 9-44CW leading, and yep, another SD70ACe.
The second queued empty behind 704 and 713 from the below post was sitting at the 27-kilometre post headed up by SD70ACe-P6 unit 727 with serial number 20188761-006, build date of 11/2019 and SD70ACe/LCi unit 703 with serial number 20118611-003, built back in 8/2012.
The FMG SD70ACe-P6 units were an extension of a Norfolk Southern build #20186662 road numbers #1215 to 1224 from November 2018.
The first loaded train appeared at 1648 hrs behind SD70ACe/LCI pair 719 serial number 20118693-011 built back in August 2012 and was the final unit from the second order of SD70 units and class leader 701 "T155 - Glen Davies" with serial number 20118611-001, also from August 2012.
Two hundred and forty loaded waggons in one hundred and twenty pairs are behind 719 and 701 as they head for the dumpers at Port Hedland seen here passing between the two empty trains. 1648 hrs on the 27th December 2023.
Friday, 5 January 2024
Well, been a bit slack here, did spend a week in Kalgoorlie in October but then just been working, working, working as I progress the fit out of the train room.
Anyway, got out the other arvo and saw a few empty FMG trains queued on the west track from the end of the port duplication near the 30km, back to the 20 km.
The interesting thing was they were all operated by the SD70ACe variants that FMG operate.
704 with serial number 20118611-004 and 713 with serial number 20118693-005 both from the first and second orders respectively hold the west mainline with ~240 empty waggons.1630 hrs 27th of December 2023.
Sunday, 11 June 2023
FMG arvo action 1st June 2023.
![]() |
The above image was taken at 60 mm, settings were an ISO of 250 and shutter of 1/640th with an aperture of F9. Slightly brightened and some contrast. |
Second movement of the arvo was the port pilot shunting out and back to allow another empty train to depart the port. The pilot locos were EMD SD70ACe/LCi 711 serial number 20118693-003 and GE rebuild AC44C6M 106 serial number 50634 with compressor car set CC005.
![]() |
Taken in the golden hour before sunset, image taken at 50 mm at ISO 250 with a shutter of 1/640th and an aperture of F8. |
Saturday, 1 April 2023
BHP loaded and empty meet at Boodarie.
A BHP empty train led by a pair of EMD SD70ACe locomotives bombs a loaded arrival at Boodarie Yard.
BHP's EMD SD70ACe units 4438 'Rail Runner' serial number 20128866-007 and the current highest numbered unit 4497 serial number 20198860-006 lead their empty rake towards Bing along the west mainline having just passed signal BES5.
Both 4438 'Rail Runner' and 4497 were built by Progress Rail at their Muncie facility with 4438 being delivered in 2013 and 4497 delivered in 2020.
Port Hedland has a lot of road over rail bridges, these photos are taken from one on the realigned Great Northern Highway around the back of Wedgefield located over Boodarie Yard, then the Wallwork Road overbridge is visible in the distance of these photos. There is the overbridge beyond the Wallwork Rd bridge for Buttweld Road which is between Goldsworthy Junction and the rail welding facility on the BHP line, the new bridge being built on the Broome Road to carry the road again over the BHP line at the 12 km, the original Redbank Bridge for Wilson Street over the BHP entry to Hedland Yard, the overbridge on the Great Northern Highway which passes over the top of the FMG lines between their Kanyirri Yard and the port and yet another bridge further out to carry the Great Northern Highway over the Roy Hill line.
Monday, 20 March 2023
FMG's 701 and 105 lead a loaded at the 5 km.
EMD SD70ACe/LCi class leader 701 'T155-Glen Davies' serial number 20118611-001 leads AC44C6M unit 105 rebuilt from former BNSF 9-44CW unit 4826 with serial number 50680 at the 5 km post as they arrive at the port for unloading.
701 has the T155 motif on the cab lefthand side, and a plate 'Glen Davies' on the righthand side.
Sunday, 6 March 2022
FMG SD90MAC-H2 units finally scrapped.
The long stored, since 2015, SD90MAC-H2 units owned by FMG have finally been cut up by CD Dodd in Port Hedland. The units involved were the 910 to 917 listed below as:
FMG number, original Union Pacific number, serial number:
- 910, 8538, 976833-17
- 911, 8548, 976833-27
- 912, 8550, 976833-29
- 913, 8557, 976833-36
- 914, 8525, 976833-04
- 915, 8553, 976833-32
- 916, 8543, 976833-22
- 917, 8547, 976833-26
Tuesday, 13 July 2021
West Australian Rails - Extra North 003
The latest issue of West Australian Rail is now online, albeit a special 'Extra North' edition covering some of the sightings myself and Roland Depth have captured in the Pilbara during the month of March 2021.
There will be a follow up edition to cover a few days in the Kalgoorlie region in April and then a third to cover the Pilbara again in May, stay tuned...
It can be found in the usual place or via the link below.
Enjoy!
Friday, 28 May 2021
West Australian Rails - Extra North 001
The latest issue of West Australian Rail is now online, albeit a special 'Extra North' edition covering some of the sightings myself and Roland Depth have captured in the Pilbara during the month of March 2021.
There will be a follow up edition to cover a few days in the Kalgoorlie region in April and then a third to cover the Pilbara again in May, stay tuned...
It can be found in the usual place or via the link below.
Enjoy!
Sunday, 9 May 2021
FMG SD90MAC-H2 units still stored - update.
Here's an image of FMG's eight SD90MAC-H2 units stored out of service down the south end near their rail welding rail yard. 20th March 2021.
From left (port) to right (mine) are 910, 911, 912, 917, 913, 914, 915 and 916.
From studying images, it looks like both 912 and 916 have the engines removed, while 917 is partially stripped. Also, other items have been removed, like handbrake mechanisms and no doubt other 'bits'.
Friday, 25 September 2020
Pilbara Railways Historical Society visit.
Went down and checked on the status of the museum as it has been a while. The museum is unable to be accessed by the general public now as it has a locked Rio Tinto access gate at the Dampier Salt end of the road. However, being a member access was arranged to do a quick inspection of the place.
In this image you can see from the left, the PWD crane, waggons and Simplex loco from Point Samson, a couple of ALCo engines, the Locotrol 'cab'; off of BHP 5663, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, former NSWGR ALCo RSC-3 Robe River Iron Associates 9405 renumbered to 4002, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450.
Monday, 24 August 2020
BHP SD70ACe/Lci unit delivery continues.
Another two new SD70ACe/Lci units were delivered to Nelson Point on Sunday 23rd of August. 4496 and 4494 were walked the 3.5 km distance from the Pilbara Ports Authority complex to the hard stand at BHP Nelson Point yard on Mammoet self-propelled modular transporter (SPMT) with 20 lines of 4 wheels for a total of 80 wheel. Once locos are unloaded then the platforms are again walked back to the PPA for another load.
The image shows 4496 under the loco lift gantry while 4494 waits for its turn to unload on its SPMT.
This left units 4495 and 4497 to be delivered on Monday.
Sunday, 23 August 2020
Delivery of SD70ACe/Lci units continues.
BHP's new SD70ACe/Lci units are being delivered to Nelson Point by Mammoet on their self-propelled modular transporter or SPMT, then unloaded at the BHP Nelson Point Hard Stand by a 'Loco Lift' or modular gantry system. The locos tip the scales at 180 tonnes devoid of fuel and, water and lube oil.
Friday, 21 August 2020
BHP latest loco delivery.
BHP has had a further six Electro Motive SD70ACe/Lci units delivered via the port of Norfolk, Virginia (USA) on the vessel BBC Sapphire. The six units, 4492 to 4497 were unloaded at the PPA Port Hedland wharf during Tuesday the 18th of August 2020.
Built by Progress Rail at Muncie Indiana in May of 2020 with serial numbers 20198860-001 to 20198860-006.
The units are seen here at the PPA hard stand area awaiting delivery to BHP's Nelson Point yard by heavy lift road floats by Mammoet.
Sunday, 21 June 2020
How to spot an SD70ACe-P6.
The only way to tell an SD70ACe-P6 model unit from a standard unit is the difference in height of the inverter cabinet located on the observers or left-hand side immediately behind the cab. The -P6 is slightly higher and is noticeable on Aussie units as we have a kickplate on our handrail assemblies.
The -P6 model has an inverter per axle to allow better traction control and therefore greater adhesion over the standard model which has an inverter per bogie or truck.
The attached picture shows the step height change on FMG SD70ACe-P6 unit 727 serial 20188761-006 built in Nov 2019. The FMG order was built to the same specs and at the same time as the final ten units of Norfolk Southern order for 50 units #1175-1224.
Saturday, 20 June 2020
FMG operating new EMD SD70ACe-P6 model locomotives.
Back in February 2020 two deliveries of five locos each were unloaded at Port Hedland then delivered via road to FMG. The ten units were built by Progress Rail at their Electro-Motive factory in Muncie. The units were built the same time as an order was being built for Norfolk Southern and the FMG units were delivered pretty much identical to the NS order. With the Australian standard handrails being installed locally.
The units are the SD70ACe-P6 and they have an inverter per axle rather than the standard inverter per bogie (or truck) giving better traction control and also have a higher rated T3 compliant prime mover the 16-710G3C-T3 for 4500 horsepower.
Some videos of the units running trains can be found here: Shift Pig Youtube videos.
Wednesday, 6 May 2020
FMG SD90MAC-H2 units still stored.
Here's a panorama image of FMG's eight SD90MAC-H2 units stored out of service down the south end of the Thomas rail yard. From left (port) to right (mine) are 910, 911, 912, 917, 913, 914, 915 and 916.
From studying images, it looks like both 912 and 916 have the engines removed, while 917 is partially stripped. Also, other items have been removed, like handbrake mechanisms and no doubt other 'bits'.
There was a rumour these units are to be scrapped.