Saturday, 22 November 2025

BHP's Wabtec BEL 9001, a couple of different delivery views

    Another couple of views of the delivery of BHP's brand new battery electric locomotives, this time it is 9001 and it was delivered on Sunday afternoon of November 16, 2025, at Nelson Point.

    9001 is an FXH70C model rated at 3163 kW and tipping the scales at 452,000 lbs for 205 tonnes. It is serial number 66453 and was built at Wabtec's Erie, Pennsylvania plant in the USA back in December 2023.

9001 waits at Gate 9 for site entry.
    A rear view looking down the left hand side of 9001 as it waits at BHP's Gate 9 for entry into site.

    As 9001 sits suspended, at the Nelson Point hard stand area, off the delivery trailer waiting to be placed on rails at Nelson Point, a loaded BHP train passes as it witnesses the future of rail transportation motive power as it proceeds towards the car dumpers behind the BHP standard pairing of EMD SD70ACe/LC locomotives 4344 'Tenacity' and 4342 'Marillana', both of which are from the fourth SD70ACe order and 2008 build year, hauling 135 loaded waggons.

No comments: